Google's Project Suncatcher MVP satellite launched October 1 on a SpaceX Falcon 9 Transporter-18 from Vandenberg, and Google confirmed it is operating as expected.
Post-launch reporting specified two constraints not detailed before launch: workloads run in roughly 15-minute Gemini inference bursts before passive radiator cooling, and HBM memory showed irregularities after approximately 2 krad(Si) in ground testing, identifying it as the weak point for longer missions despite Trillium chips surviving a simulated five-year radiation dose. BCG estimated a full 1 GW orbital cluster at roughly $30 billion.